Project: jseaborn   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Jeff Seaborn   -  
Project:   Dalotel DM165   -   VIEW REPORTS
Total Hours:653
Total Flight Time:
Start/Last Date:Nov 06, 2019 - Nov 06, 2019
Engine:Originally Continental IO-346 A what? Yep, an IO-346 as used in Muskateers of the same vintage
Propeller:A Regy Wooden Fixed Pitch What the heck is that? A French prop from that era
Panel:Steam gauges circa 1969. In French and in metric. Yikes!
 
Friendly URL: https://eaabuilderslog.org?s=jseaborn

Home or Last Project Picture

Apr 17, 2020     Hinges and Wheel well Ribs - (5 hours)       Category: Wings
Mounted aileron hinges.

Traced out wheel well ribs from LH wing onto card stock. Transferred tracing to plywood and cut out ribs and rib sections. Reused the steel framing studs from the spar table to be used as a 10' long straightedge. Used this straightedge to confirm contours of new ribs and to check on the existing ribs. Cut out rib stiffeners for the new ribs and steamed a few sections to permit them to fit the curve of the ribs.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.